A home extension represents one of the most significant investments you’ll make in your property. Done right, it transforms how you live, adds substantial value, and costs far less than moving house. Done wrong, it becomes a financial catastrophe that haunts you for years—leaving you with structural problems, legal issues, and a builder who’s disappeared with your money.
This comprehensive guide equips you with everything you need to hire the right builder and navigate the extension process successfully, from understanding planning permission to spotting red flags before they become disasters.
Understanding Extension Types and What They Actually Involve
Before you even speak to a builder, you need to understand what type of extension suits your needs—because not all builders specialise in every type, and the wrong choice could cost you tens of thousands.
Single-Storey Rear Extensions
The most popular option for UK homeowners, single-storey rear extensions typically add a kitchen-diner, larger living space, or extended family room. In 2025, expect to pay £1,500-£2,500 per square metre depending on specification and location.
These extensions can extend up to 4 metres for detached properties and 3 metres for terraced or semi-detached homes under permitted development rights—meaning you might not need planning permission. However, larger extensions up to 6 metres (terraced/semi) or 8 metres (detached) may be possible under the Neighbour Consultation Scheme.
Key considerations: Foundation depth, drainage relocation, roof structure (flat vs pitched), and how it connects to your existing building.
Two-Storey Extensions
Adding space both downstairs and upstairs, two-storey extensions deliver maximum return on investment. Budget £130,000-£150,000+ for a typical project depending on size and finish quality.
Most two-storey extensions require full planning permission due to their size and visual impact. The structural complexity is significantly higher than single-storey work—you’re essentially building a small house attached to your existing property.
Critical factors: Load-bearing walls, foundations (typically deeper and more substantial), roof tying-in, and ensuring the upstairs rooms have proper fire escape routes.
Side Returns and Wrap-Around Extensions
Popular in terraced houses, side return extensions reclaim that narrow alley beside your property. When combined with a rear extension, you create a wrap-around that dramatically transforms ground floor space.
Costs range from £40,000-£80,000 for a basic side return, significantly more for wrap-arounds with premium specifications.
Side returns are often tricky—they involve party wall agreements with neighbours, complex roof structures, and careful attention to natural light (since you’re filling in what was an external window wall).
Loft Conversions vs Loft Extensions
There’s an important distinction: a loft conversion works within your existing roof space, whilst a loft extension changes the roof structure itself (adding dormers, raising the ridge height, or doing a hip-to-gable conversion).
Conversions cost £30,000-£50,000, whilst extensions run £40,000-£65,000+ due to the structural alterations required.
Not all lofts are suitable for conversion—you need sufficient headroom (typically 2.2m minimum), appropriate roof structure, and space for a compliant staircase.
Basement Conversions and Excavations
The most complex and expensive option, basement work involves either converting an existing cellar or excavating beneath your property to create entirely new space.
Existing basement conversions: £1,500-£2,000 per sqm Basement excavation: £3,000-£4,000 per sqm
This work almost always requires planning permission, involves underpinning your foundations, requires tanking for waterproofing, and demands extremely skilled contractors. Get this wrong and you risk catastrophic structural failure.
Planning Permission vs Permitted Development: What You Actually Need
Understanding planning requirements prevents costly mistakes and delays. The rules changed significantly in recent years, creating more opportunities to extend without formal planning permission.
Permitted Development Rights Explained
Under permitted development, you can extend your house without planning permission if you meet specific criteria:
For single-storey rear extensions:
- Maximum 4m for detached houses
- Maximum 3m for terraced or semi-detached properties
- Cannot extend beyond half the area of land around the original house
- Cannot be higher than 4m
- Within 2m of a boundary, maximum height is 3m
- Cannot be built in front of the principal elevation
For two-storey extensions:
- Maximum 3m beyond the rear wall
- Cannot be higher than the highest point of the existing roof
- Within 2m of a boundary, eaves cannot exceed 3m
- Significantly more restricted than single-storey options
Critical exclusions:
- Flats and maisonettes (no permitted development rights)
- Listed buildings
- Conservation areas (restrictions apply)
- National Parks and Areas of Outstanding Natural Beauty
- Properties where permitted development rights have been removed by planning conditions
When You Definitely Need Planning Permission
Submit a full planning application when:
- Your extension exceeds permitted development limits
- Your property doesn’t have permitted development rights
- You’re making substantial alterations to the front elevation
- You’re building a substantial wrap-around or side extension
- You’re in a conservation area or your home is listed
Planning application costs in 2025: £528 in England for householder applications. From April 2025, fees increase annually with inflation (capped at 10%).
Timeline: Allow 8 weeks minimum for planning decisions, though complex applications or difficult councils can take considerably longer.
Building Regulations: The Non-Negotiable Requirement
Here’s what catches many homeowners out: even if you don’t need planning permission, you always need Building Regulations approval for extensions.
Building Regulations ensure your extension is structurally sound, energy-efficient, and safe. They cover:
- Structural integrity (foundations, load-bearing walls, roof structure)
- Fire safety (escape routes, fire doors, materials)
- Drainage and sanitation
- Energy efficiency (insulation, glazing, heating)
- Ventilation
- Electrical safety
- Sound insulation (particularly for conversions)
Costs: £100-£150 to submit plans, plus £200-£400 for site inspections, depending on your local authority.
Warning: Building Regulations apply to your entire property, not just the extension. This sometimes triggers unexpected costs—you might need to add fire doors throughout your house, upgrade electrical wiring, or improve insulation in existing areas to meet current standards.
The True Cost of Extensions in 2025
Understanding realistic costs prevents budget disasters and helps you spot suspiciously cheap quotes that signal problems.
Cost Per Square Metre Breakdown
Basic specification: £1,500-£2,000/sqm
- Standard materials
- Simple design
- Minimal architectural input
- Basic kitchen/bathroom fittings
Mid-range specification: £2,000-£2,500/sqm
- Good quality materials
- Some architectural design
- Branded kitchens/bathrooms
- Bi-fold or sliding doors
- Underfloor heating
Premium specification: £2,500-£3,500/sqm+
- High-end materials
- Architect-designed
- Luxury fittings and finishes
- Complex engineering solutions
- Premium glazing and doors
- Smart home integration
Regional Variations
Location dramatically affects costs:
- London and Southeast: Add 30-50% to base costs
- Major cities (Manchester, Birmingham, Bristol): Add 15-25%
- Northern England: Base rates
- Scotland: Variable (Edinburgh premium, rural areas lower)
- Rural areas: Can be 10-20% cheaper, but access issues may increase costs
What Drives Your Final Bill
Ground conditions: Poor soil, high water tables, or existing foundations in poor condition increase costs significantly. Budget £3,000-£8,000 extra for problematic ground conditions.
Structural complexity: Opening up load-bearing walls, installing steel beams, or creating vaulted ceilings adds £5,000-£15,000+ depending on scale.
Services relocation: Moving boilers, radiators, drainage, or electrical consumer units can add £3,000-£10,000.
Specification choices: Premium bi-fold doors (£4,000-£8,000), underfloor heating (£75-£100/sqm), and luxury kitchen installations (£15,000-£40,000+) quickly escalate costs.
Professional fees: Architect (8-12% of build cost), structural engineer (£1,500-£3,000), party wall surveyors (£1,000-£2,000 per neighbour), building control (£300-£500).
Contingency: Always add 10-15% for unexpected issues. Older properties often require 20% contingency.
Finding the Right Builder: Beyond Google and Recommendations
What Makes a Builder Qualified for Extension Work
Not all builders are created equal. Extension work requires specific expertise that many general builders lack.
Look for builders with:
Structural experience: Extensions involve foundations, load-bearing walls, and roof structures. Your builder needs demonstrated experience with these elements—not just cosmetic renovation work.
Trade coordination: A good extension builder manages multiple trades (groundworkers, bricklayers, roofers, plumbers, electricians, plasterers) and coordinates them efficiently. Poor coordination causes delays and cost overruns.
Building Regulations knowledge: Your builder should understand regulations and work closely with building control. Builders who are casual about inspections will leave you with compliance issues.
Portfolio evidence: Demand to see completed extensions similar to your project—not just photos of pristine kitchens or repointed brickwork.
Essential Checks Before You Hire
Insurance verification:
- Public Liability Insurance (minimum £2 million, preferably £5 million)
- Employers’ Liability Insurance (if they employ staff)
- Professional Indemnity Insurance (for design-build contracts)
Ask to see current certificates—not just mentions on their website. Insurance can lapse, and uninsured builders leave you catastrophically exposed if something goes wrong.
Trade body membership:
- Federation of Master Builders (FMB)
- National Federation of Builders (NFB)
- Trustmark registered
Membership indicates commitment to standards and provides dispute resolution routes, though it’s not a guarantee of quality.
Financial stability: Check Companies House for recent accounts. Builders operating on the edge financially may cut corners, disappear mid-project, or demand excessive upfront payments.
References and site visits: Speak to at least three recent clients—preferably with similar projects. Ask pointed questions:
- Did they finish on time?
- Were there unexpected costs?
- How did they handle problems?
- Would you hire them again?
Request to visit completed projects if possible. Photos can be misleading; seeing finished work in person reveals quality.
The Quote Process Done Properly
Request detailed, itemised quotes from 3-4 builders. Vague, single-figure quotes are worthless for comparison and leave you exposed to extras.
A proper quote includes:
- Labour costs broken down by trade
- Materials specification and costs
- Groundwork and foundation details
- Structural elements (beams, lintels, roof structure)
- Services (plumbing, electrical, heating)
- Professional fees (if builder is coordinating)
- Waste removal and skip costs
- Timeline with key milestones
- Payment schedule
- Warranty information
- What’s explicitly excluded
Red flag quotes:
- Significantly cheaper than others without clear explanation
- Cash-only offers
- Pressure to sign immediately
- Vague descriptions like “all work completed to high standard”
- Large upfront deposits (over 10-15%)
- No mention of warranties or guarantees
Understanding Payment Structures
Never pay large sums upfront. Legitimate builders don’t need 30-50% deposits before starting work.
Standard payment schedules:
- Deposit: 10-15% to secure dates and order long-lead materials
- Foundation complete: 25-30%
- Roof watertight: 25-30%
- First fix complete (plumbing, electrical, plastering): 20-25%
- Completion and snagging: 10% retention for 4-8 weeks
Red flags:
- Requests for large cash payments
- Pressure to pay ahead of work completed
- Reluctance to provide receipts
- Vague payment milestones
- No retention period
Always pay via bank transfer (not cash), keep records, and tie payments to measurable progress.
The Contract: Non-Negotiable Protection
Never proceed without a written contract. A handshake agreement offers zero protection when problems arise—and they often do.
What Your Contract Must Include
Scope of work: Every element specified in detail Timeline: Start date, completion date, and penalties for delays Payment schedule: Amounts and triggers clearly defined Materials: Exact specifications, not “builder’s choice” Insurance: Proof required before work starts Warranty: Typically 6-12 months for defects Variations: How changes are priced and approved Dispute resolution: Process for handling disagreements Site conditions: Working hours, access, welfare facilities Client obligations: Your responsibilities (access, decision-making, payments)
Use standard contracts like:
- JCT Building Contract for a Home Owner/Occupier (for projects over £100,000)
- FMB contracts for members
- Consumer Rights Act 2015 protections
Avoid builder’s own “standard” contracts without legal review.
Protecting Yourself Against Cowboy Builders
Warning signs during the project:
- Cutting corners on foundations or structural work
- Avoiding building control inspections
- Excessive “unexpected” additional costs
- Rushing jobs or poor workmanship
- Subcontractors not being paid
- Pressure for early payments
- Aggressive behaviour when challenged
If problems arise:
- Document everything (photos, emails, messages)
- Communicate in writing
- Withhold payments if work isn’t to standard
- Involve trade body if they’re members
- Seek legal advice early
- Report to Trading Standards for criminal behaviour
Managing Your Extension Project
Even with an excellent builder, successful projects require active homeowner involvement.
Your Role as Project Manager
Make timely decisions: Delaying choices on tiles, kitchens, or electrical layouts causes expensive delays. Builders can’t proceed until you decide.
Be available: Builders will have questions. Being unreachable for days frustrates your team and slows progress.
Understand the critical path: Some work must happen in sequence. You can’t install your kitchen until plumbing and electrical are complete and plastering is done.
Prepare for disruption: Extensions are messy, noisy, and invasive. Accept this reality and plan accordingly.
Building Control Inspections
Your builder should notify building control at key stages:
- Foundation excavation
- Foundation concrete pour
- Drainage installation
- Structural elements (steels, lintels)
- Damp-proof course
- Completion
Never let builders pressure you to skip inspections or proceed before approval. This leaves you with an illegal extension that you cannot mortgage or sell easily.
Common Problems and How to Handle Them
Unexpected structural issues: Older properties often hide problems. Budget 10-20% contingency for discoveries like decayed timbers, poor foundations, or asbestos.
Weather delays: Winter projects face rain delays. Realistic builders factor this into timelines; unrealistic ones make impossible promises.
Supply chain issues: Material shortages and delivery delays remain problematic. Confirm lead times early and have backup options.
Neighbour disputes: Party wall agreements and noise complaints can derail projects. Communicate with neighbours early and manage expectations.
After Completion: Snagging and Sign-Off
The Snagging Process
Create a snagging list before final payment:
- Cosmetic issues (scratches, paint drips, gaps)
- Functional problems (doors not closing, windows not locking)
- Incomplete work
- Quality concerns
Professional snagging inspectors cost £300-£600 and often identify issues you’d miss.
Withhold 5-10% retention until snagging is complete, typically 4-8 weeks after practical completion.
Essential Sign-Offs and Documentation
Building Control completion certificate: Confirms compliance with Building Regulations. Required for selling or remortgaging. Chase this if it doesn’t arrive within weeks of completion.
Warranties and guarantees: Collect these for all significant materials and installations (glazing, roofing, damp-proofing).
Electrical certificates: Required for all new electrical work.
Gas Safe certificates: If any gas work was involved.
Insurance documentation: Structural warranty insurance (often 10 years) provides protection against major defects.
Planning compliance: If you had planning permission, ensure the building was constructed according to approved plans.
Final Thoughts: Making Your Extension a Success
A home extension transforms how you live, but only if you approach it with realistic expectations, proper preparation, and the right professionals.
Key principles for success:
- Choose builders based on capability and track record, not the cheapest price
- Invest in proper design and planning before construction starts
- Understand what you’re signing and paying for at every stage
- Maintain contingency budgets for the inevitable unexpected issues
- Communicate clearly and often with your building team
- Prioritise quality over speed—rushed extensions create lasting problems
The difference between a successful extension that adds value and enjoyment and a nightmare that haunts you for years comes down to the decisions you make before a spade touches the ground.
Looking for carefully vetted builders with proven extension experience? Discover how TraderStreet.uk connects homeowners with qualified builders who’ve been rigorously assessed for competence, insurance, and track record—helping you avoid the cowboys and find the professionals who deliver quality work on time and on budget.